Construction of
the district commission Melk |
| |
|
|
|
Project:
Construction of the
district commission Melk – a common building shell of the
administrative building and the food production market was
realized.
Client:
Amt der NÖ Landesregierung BD6
Bahnstraße 2, A-2340 Mödling
Scope
of services:
Heating / air condition /
ventilation / sanitary installations / MSR /
electrical engineering
(Design & site
supervision)
Technical data:
Total area:
7.000 m²
Connection power: 250 kW
Construction period:
8/2006 - 11/2007
Costs electrical
engineering:
€ 800.000,00 |
 |
| |
|
|
|
|
Construction manamgement center in Klagenfurt |
| |
|
|
|
Project:
Construction manamgement center in Klagenfurt
Client:
LIG Landesimmobilien Kärnten GmbH
Ferdinand-Seeland-Straße 27, A-9020 Klagenfurt
Scope
of services:
Heating / air condition /
ventilation / sanitary installations / MSR /
electrical engineering
(site supervision)
Construction period:
10/2005 - 10/2007
Costs:
€ 2.100.000,00 |
 |
| |
|
|
|
|
Graz - Unizentrum
Theologie |
| |
|
|
|
| Project:
Construction Unizentrum Theologie, Graz
Client:
Baumeister Leitner
Planung & Bauaufsicht Gesellschaft mbH
Schönaugasse 4/IV, A-8010 Graz
Scope of services:
Heating / air condition /
ventilation / sanitary installations / MSR /
electrical engineering
Construction period:
4/2006 - 9/2007
Costs:
€ 1.606.000,00 |
 |
| |
|
|
|
|
Bad Radkersburg -
Construction of the whole operations centre |
| |
|
|
|
|
Project:
Construction of the whole operations centre with the
following areas: Public, Auxiliary fire brigade, police,
rescue and municipality
Client:
Errichtungsgemeinschaft Sicherheitszentrum Süd-Ost
Hauptplatz 1, A-8490 Bad Radkersburg
Scope of services:
Heating / ventilation / sanitary installations /
electrical engineering / solar technology
(Design & site supervision)
Technical data:
Total area:
4.100 m²
Connection power: 300 kW
Construction period:
4/2007 - spring 2008
Costs:
€ 1.130.000,00 |
 |
| |
|
|
|
|
Linsberg Asia- Thermal resort |
| |
|
|
|
| Projekt:
Construction of a thermal
resort
Client:
Alt & Neu Bauträgergesellschaft mbH
Schönaugasse 10, 8010 Graz
Umfang:
Scope
of services:
Heating / air condition /
ventilation / sanitary installations /
electrical engineering
(Design & site
supervision)
Technical data:
▪ Total area: 31.326,15 m²
▪ Heatin load: 5.000,00 kW
▪ Cooling load: ca. 1.050,00 kW
Construction period:
10/2006 - spring 2008
Costs:
€ 8.200.000,00
zum Thermenbau... |
 |
| |
|
|
|
| |
|
|
|
| |
|
|
|