projects -
infrastructure |
|
references
|
|
| |
|
|
|
|
Sinabelkirchen -
District heating |
| |
|
|
|
Project:
Fernwärme A-8261 Sinabelkirchen,
1,500 kW biomass und 800 kW oil
Scope of services:
Design and side supervision -heating/sanitary
installations/district heat supply incl. boiler
house and district heat supply lines
Technical data:
1. Stage of extension 1,500 KW
Final stage: 4,000 KW
Length of pipelines: 1.400 m
Pressure: 7 bar
Primary cycle: 90 C – 60 C
Construction period
7/2003 until autumn 2004 |
 |
| |
|
|
|
|
Abtenau
- Cogeneration plant
|
| |
|
|
|
Project:
Cogeneration plant Abtenau, Salzburg AG
Combinated heat and power generation through biomass
Scope of services:
Design, static calculation, site supervision,
construction site coordination
Technical data:
6,000 kW thermal power
1,200 kW electric power via ORC-system
Construction period:
5/2004 until 12/2004
|
 |
| |
|
|
|
|
Altenmarkt
- District heat |
| |
|
|
|
Project:
District heat supply of Altenmarkt and the company
Atomic
Scope of services:
Design, static calculation, site supervision,
construction, site coordination
Technical data:
Biomass cogeneration plant 5,000 kW thermal
power (final stage 7,500 kW)
500 kW electric power via ORC-system
approx. 6,000 m public power supply
Construction period:
7/2004 bis 8/2005
|
 |
| |
|
|
|
|
Kaindorf -
District heat |
| |
|
|
|
| Project:
Biomass heating installation Kaindorf bei Hartberg
Scope of services:
Design and site supervision, refurbishment of the
heating system
Technical data:
Total power: 320 kW
Energy saving per year:
approx. 65,000 kW (total)
Cost saving per year: approx.
2.300 €
Construction period:
2004
|
 |
| |
|
|
|
|
Hinterstoder -
Local heat |
| |
|
|
|
Project:
District heat supply Hinterstoder, biomass
district heating station (800 kW) and approx.
1.6 km public power supply
Scope of services:
Design, static calculation, site
supervision
Technical data:
800 kW biomass boiler - winter
400 kW biomass boiler for fewer operation or
covering peak operation
Boiler house: 110 m²
Storage of the wood chips: 300 m²
Construction period:
Spring 1998 – Winter 1998
|
 |
| |
|
|
|
|
Feldkirchen
- Project study |
| |
|
|
|
| Project:
Project study, A-9560 Feldkirchen i. Kärnten
Scope of services:
Study – district heating network
Techniscal data:
5,000 thermal power
Approx. 5,400 m length of pipelines
Approx. 5.9 bn. kWh energy
consumption per year
Approx. 203,000 € saving of
electricity costs per year
Construction period:
Spring – autumn 2006
|
 |
| |
|
|
|
|
Grabnerhof
-
Biomass district heating |
| |
|
|
|
Project:
Biomass district heating station incl. public power
supply to Landwirtschaftliche Fachschule Grabnerhof
Scope of services:
Design, static calculation, site supervision
Technical data:
500 kW biomass boiler - winter
Boiler house: 105 m²
Storage of the wood chips: 300 m²
Length public power supply:
approx. 400 m
Construction period: 8/1998 - 12/1998
|
 |
| |
|
|
|
| |
|
|
|