Wien -
Construction office scc |
| |
|
|
|
Project:
Constrution of the office scc, Wambachergasse 10, A-1130 Wien
Client:
scc EDV-Beratung AG Wambachergasse 10, 1130 Wien
Scope of services:
Heating / air
condition / ventilation / sanitary installations / MSR /
electrical engineering
(Design & site
supervision)
Technical data:
Heating load:
63 kW
Cooling load:
60 kW
Air quantity: 3.000 m³/h
Connection power: 170 kW
Construction period:
Summer 2007 - summer 2008
Costs:
~ 680.000,00 € |
 |
| |
|
|
|
|
Klagenfurt - new
building Rutarcenter |
| |
|
|
|
Project:
Construction of a
furniture store – the biggest furniture store of
Carinthia
Client:
Jauntaler Handelsgesellschaft Geschwister Rutar GesmbH
Eisenkappeler Straße 10,
A-9141 Eberndorf
Scope of services:
Heating / air condition /
ventilation / sanitary installations / MSR /
electrical engineering
(Design & site
supervision)
Total area: 35.000 m²
Heating load: 1,5 MW
Cooling load 1,2 MW
Air quantity:
100.000 m³/h
Connection power: 1,6 MW
Construction period:
10/2007 - 01/2008
Costs:
€ 4.845.000,00 |
 |
| |
|
|
|
|
Graz -
Geidorf Center |
| |
|
|
|
| Project:
Construction of a residential building and a commercial
property consisting of several houses one shop area
(ground floor) as well as an underground garage.
Client:
Fleissner + Partner GesmbH
Merangasse 75, A-8010 Graz
Scope
of services:
Heating / ventilation /
sanitary installations / MSR
(Design & site
supervision)
Technical data:
Heating load: 636 kW
Heated area without the underground garage: 12.291,5 m²
underground garage: 6.758,16 m²
Construction period:
01/2006 - 04/2008
Costs
€ 1.910.000,00 |
 |
| |
|
|
|
|
Leibnitz -
shopping mall |
| |
|
|
|
Project:
Construction of a mall with 17.000 m² total area
Client:
"MB" Mörz Immobilien GmbH & Co OEG
Dienersdorf 191, A-8224 Kaindorf
Scope
of services:
Heating / air condition /
ventilation / sanitary installations / MSR /
electrical engineering
(Design & site
supervision)
Technical data:
Total area: 17.000 m² Heating
load: 1.100 kW
Cooling load: 1.150 kW
Air quantity:
90.000 m³/h
Connection power: 1.400 kW
Construction period:
09/2007 - 03/2008
Costs HVACR and electro technical equipment:
€ 3.950.000,00 |
 |
| |
|
|
|
|
Graz - office building Raiffeisenverband Steiermark |
| |
|
|
|
Project:
Construction of
an office building Raiffeisenverband Steiermark
Client:
Minos
Liegenschaftsverwaltungs GmbH
8010 Graz
Scope of services:
Heating / air
condition / ventilation / sanitary installations / solar
technology / electrical engineering / measuring and
control technology as well as engineering
(Design & site supervision)
Technical data:
Heating load: 63 kW
Cooling load:
74 kW
Air quantity:
6.300 m³/h
Connection power:
45 kW
Total area:
1.840 m²
Construction period:
05/2006 - 09/2007
Costs HVACR and electro technical equipment: €
850.000,00
|
 |
| |
|
|
|
| |
|
|
|
|
| |
 |