projects -
alternative energy |
|
references
|
|
| |
|
|
|
|
|
| |
|
|
|
|
Graz - Elisabethstraße 85 - Friedrich Schiller
Studentenheim |
| |
|
|
|
Project:
Reconstruction Studentenwohnungen des Friedrich Schiller
Studentenheim
A-8010 Graz
Client:
L&P Projektentwicklungs GmbH & Co KEG, Schönaugasse 6,
A-8010 Graz
Scope of services:
Heating / ventilation / sanitary installations /
electrical engineering / solar technology
(Design & site supervision)
Technical data:
Thermal heat requirement: 290 kW
Air quantity: 3.500 m³/h
Facades collectors: 187 m²
Connection power: 150 kW
Construction period:
Summer 2006 - 2007
Costs:
€ 1.200.000,00 |
 |
| |
|
|
|
|
Graz - Bürohaus
Raiffeisenverband
Steiermark |
| |
|
|
|
Project:
Construction of
an office building Raiffeisenverband Steiermark
Client:
Minos
Liegenschaftsverwaltungs GmbH
8010 Graz
Scope of services:
Heating / air
condition / ventilation / sanitary installations / solar
technology / electrical engineering / measuring and
control technology as well as engineering
(Design & site supervision)
Technical data:
Heating load: 63 kW
Cooling load:
74 kW
Air quantity:
6.300 m³/h
Connection power:
45 kW
Total area:
1.840 m²
Construction period:
05/2006 - 09/2007
Costs HVACR and electro technical equipment: €
850.000,00
|
 |
| |
|
|
|
|
Bad Radkersburg -
Einsatzzentrale |
| |
|
|
|
| Project:
Construction
des gesamten
Einsatzzentrums mit Bereichen: Allgemein, Freiwillige
Feuerwehr, Polizei, Rettung und Gemeinde
Client:
Errichtungsgemeinschaft Sicherheitszentrum Süd-Ost
Hauptplatz 1, A-8490 Bad Radkersburg
Scope of services:
Heating / ventilation / sanitary installations /
electrical engineering / solar technology
(Design & site supervision)
Technical data:
Total area:
4.100 m²
Connection power: 300 kW
Construction period:
4/2007 - spring 2008
Costs:
€ 1.130.000,00 |
 |
| |
|
|
|
| |
|
|
|
|
Bad Radkersburg -
Einsatzzentrale |
| |
|
|
|
| Project:
Construction
des gesamten
Einsatzzentrums mit Bereichen: Allgemein, Freiwillige
Feuerwehr, Polizei, Rettung und Gemeinde
Client:
Errichtungsgemeinschaft Sicherheitszentrum Süd-Ost
Hauptplatz 1, A-8490 Bad Radkersburg
Scope of services:
Heating / ventilation / sanitary installations /
electrical engineering / solar technology
(Design & site supervision)
Technical data:
Total area:
4.100 m²
Connection power: 300 kW
Construction period:
4/2007 - spring 2008
Costs:
€ 1.130.000,00 |
 |
| |
|
|
|
|
Frohnleiten - Sport- und
Freizeitanlage |
| |
|
|
|
Project:
Construction of a sport- and leisure center
A - 8130 Frohnleiten
Client:
Stadtgemeinde Frohnleiten
Orts- und Infrastrukturentwicklungs KEG
Brucker Straße 2, A-8130 Frohnleiten
Scope of services:
Heating / ventilation / sanitary installations / MSR
/ solar technology
(Design & site supervision)
Construction period:
2/2003 - 9/2004
Costs:
€ 1.000.000,00 |
 |
| |
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
Graz - Xenon
Light |
| |
|
|
|
Project:
Extention of the productionhall Xenon-Light
Client:
Xenon Light GmbH
A-8055 Graz
Scope of services:
Heating / ventilation / sanitary installations /
electrical engineering /
Technical data:
Heating load: 210 kW
Cooling load: 170 kW
Total area: ca. 6.000 m²
Construction period:
2/2006 - 8/2006
Costs:
€ 1.000.000,00 |
 |
| |
|
|
|
|
AWH Steinfeld |
| |
|
|
|
Project:
Construction AWH Steinfeld
Client:
Sozialhilfeverband Spittal/Drau
Dr.-Albertini-Straße 6,
9800 Spittal/Drau
Scope of services:
Heating / ventilation / sanitary installations /
Construction period:
5/2004 - 9/2005
Costs:
€ 850.000,00 |
 |
| |
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
Sinabelkirchen -
District heating |
| |
|
|
|
Project:
Fernwärme A-8261 Sinabelkirchen,
1,500 kW biomass und 800 kW oil
Scope of services:
Design and side supervision -heating/sanitary
installations/district heat supply incl. boiler
house and district heat supply lines
Technical data:
1. Stage of extension 1,500 KW
Final stage: 4,000 KW
Length of pipelines: 1.400 m
Pressure: 7 bar
Primary cycle: 90 C – 60 C
Construction period
7/2003 until autumn 2004 |
 |
| |
|
|
|
|
Abtenau
- Cogeneration plant
|
| |
|
|
|
Project:
Cogeneration plant Abtenau, Salzburg AG
Combinated heat and power generation through biomass
Scope of services:
Design, static calculation, site supervision,
construction site coordination
Technical data:
6,000 kW thermal power
1,200 kW electric power via ORC-system
Construction period:
5/2004 until 12/2004
|
 |
| |
|
|
|
|
Altenmarkt
- District heat |
| |
|
|
|
Project:
District heat supply of Altenmarkt and the company
Atomic
Scope of services:
Design, static calculation, site supervision,
construction, site coordination
Technical data:
Biomass cogeneration plant 5,000 kW thermal
power (final stage 7,500 kW)
500 kW electric power via ORC-system
approx. 6,000 m public power supply
Construction period:
7/2004 bis 8/2005
|
 |
| |
|
|
|
|
Kaindorf -
District heat |
| |
|
|
|
| Project:
Biomass heating installation Kaindorf bei Hartberg
Scope of services:
Design and site supervision, refurbishment of the
heating system
Technical data:
Total power: 320 kW
Energy saving per year:
approx. 65,000 kW (total)
Cost saving per year: approx.
2.300 €
Construction period:
2004
|
 |
| |
|
|
|
|
Hinterstoder -
Local heat |
| |
|
|
|
Project:
District heat supply Hinterstoder, biomass
district heating station (800 kW) and approx.
1.6 km public power supply
Scope of services:
Design, static calculation, site
supervision
Technical data:
800 kW biomass boiler - winter
400 kW biomass boiler for fewer operation or
covering peak operation
Boiler house: 110 m²
Storage of the wood chips: 300 m²
Construction period:
Spring 1998 – Winter 1998
|
 |
| |
|
|
|
|
Feldkirchen
- Project study |
| |
|
|
|
| Project:
Project study, A-9560 Feldkirchen i. Kärnten
Scope of services:
Study – district heating network
Techniscal data:
5,000 thermal power
Approx. 5,400 m length of pipelines
Approx. 5.9 bn. kWh energy
consumption per year
Approx. 203,000 € saving of
electricity costs per year
Construction period:
Spring – autumn 2006
|
 |
| |
|
|
|
|
Grabnerhof
-
Biomass district heating |
| |
|
|
|
Project:
Biomass district heating station incl. public power
supply to Landwirtschaftliche Fachschule Grabnerhof
Scope of services:
Design, static calculation, site supervision
Technical data:
500 kW biomass boiler - winter
Boiler house: 105 m²
Storage of the wood chips: 300 m²
Length public power supply:
approx. 400 m
Construction period: 8/1998 - 12/1998
|
 |
| |
|
|
|
|
|
| |
|
|
|
|
Italien Po-Ebene -
Biogas plant |
| |
|
|
|
Project:
Biogas plant Po-Ebene;
13,000 kW electric power and
13,000 kW thermal power
Substrate:
Liquid manure of 18,000 – 25,000 pigs (hog
feeding) and 1,000 tons/year poultry
dung
Floor space required for the plant:
15 hectares
|
 |
| |
|
|
|
|
China -
Biogas plant |
| |
|
|
|
Project:
Biogas plant Urumqi;
1,800 kW electric power and
1,800 kW thermal power
Substrate:
60 tons swill/day;
30 tons food waste/day;
60 tons sludge/day
Floor space required for the plant:
3.0 hectares
|
 |
| |
|
|
|
|
Serbien -
Biogas plant |
| |
|
|
|
Project:
Biogas plant near Belgrade in Serbia; 1,000 kW
electric power and
1,000 thermal power
Substrate:
Liquid manure of 10,000 cattles
Floor space required for the plant: 3.0
hectares
|
 |
| |
|
|
|
|
St. Veit/Glan -
Analysis Biogas plant |
| |
|
|
|
Project:
Analysis biogas plant; St.
Veit/Glan, Austria
Substrate:
Cut gras
|
 |
| |
|
|
|
| |
|
|
|