5 Railway Stations, Romania
|
| |
|
|
|
Project:
Renovation of 5 railway stations in Romania,
Satu Mare, Baia Mare, Targu Jiu, Targoviste,
Miercurea Ciuc
Client: CFU – Ministry of Public
Finance
CFR – Caile Ferate Romane
Project is funded by the European Union
Scale:
Heating/Air conditioning/Ventilation/
Sanitary/Electrical engineering/
Measurement & Control Technology (Design)
▪ Obstructed area ca. 9,500 m²
▪ Central configuration of the
technology
▪ Cooling via fan coils and ventilation
system
▪ Video observance and sound system
Technical data:
Heat requirement:
716 kW
Refrigeration load:
335 kW
Total quantity of air:
25,400 m³/h
Electrical connected load:ca. 1,350
kW
Construction period:
2007 until 2008
Production costs:
€ 3,685,000.00 (net)
|
 |
| |
|
|
|
Star Gallery Plovdiv, Bulgaria
|
| |
|
|
|
Project:
Renovation and construction of a shopping centre
in Plovdiv
Client:
A&N Planungs- und Verwaltungs GmbH & Co
KG
Schönaugasse 6, A-8010 Graz
Scale:
Heating/Air
conditioning/Ventilation/
Sanitary/Electrical engineering
(Design & Expert Site Supervision)
▪ Obstructed area ca. 3,000
m²
▪ Heating via ventilation
system and
fan coils
▪ Central configuration of
the
technology
▪ Alarm monitoring
Technical data:
Heat requirement: 135 kW
Electrical connected load:
ca. 630 kW
Chiller: 237 kW
Heating load: 135 kW
Construction period:
2004 until 2008
|
 |
| |
|
|
|
Pipera Business Tower, Romania
|
| |
|
|
|
Project:
New development of an office building
and a commercial property Pipera
Business Tower, Bucharest/Romania
Client:
S + B Plan & Bau GmbH
Löwengasse 47, A-1130 Wien
Scale:
Heating/Air
conditioning/Ventilation/Sanitary/
Electrial engineering (Design &
Accompanying Site Supervision)
▪ Heating and cooling of the
office
rooms with fan coils
▪ Heat generation with gas
boiler
systems
▪ Refrigeration with
refrigerating
machines on the roof
▪ Temperature control of the
underground parking
▪ Central measurement and
control
technology
▪ Closed circuit television
▪ Access control
▪ Standby power supply
system
▪ Fire alarm system, safety
lighting
system
Technical data:
Heat output:
850 kW
Cooling capacity:
850 kW
Electrical connected
load: 1,200 kW
Construction period:
March 2008 until December 2009
Production costs:
€ 1,500,000.00
(net - only electrical
engineering)
|
 |
| |
|
|
|
| |
|
|
|
|
|
|
|
|
| |
 |