5 Railway Stations, Romania

       
Project:
Renovation of 5 railway stations in Romania,
Satu Mare, Baia Mare, Targu Jiu, Targoviste, Miercurea Ciuc
 
Client: CFU – Ministry of Public Finance
CFR – Caile Ferate Romane
Project is funded by the European Union
 
Scale:
Heating/Air conditioning/Ventilation/
Sanitary/Electrical engineering/
Measurement & Control Technology (Design)
▪ Obstructed area ca. 9,500 m²
▪ Central configuration of the
  technology
▪ Cooling via fan coils and ventilation
  system
▪ Video observance and sound system

Technical data:
Heat requirement:                   716 kW
Refrigeration load:                   335 kW
Total quantity of air:        25,400 m³/h
Electrical connected load:ca. 1,350 kW
 
Construction period:
2007 until 2008
 
Production costs:
€ 3,685,000.00 (net)

       

Star Gallery Plovdiv, Bulgaria

       
Project:
Renovation and construction of a shopping centre in Plovdiv
 
Client:
A&N Planungs- und Verwaltungs GmbH & Co KG
Schönaugasse 6, A-8010 Graz
 
Scale:
Heating/Air conditioning/Ventilation/
Sanitary/Electrical engineering (Design & Expert Site Supervision)
▪ Obstructed area ca. 3,000 m²
▪ Heating via ventilation system and
  fan coils
▪ Central configuration of the
  technology
▪ Alarm monitoring

Technical data:
Heat requirement: 135 kW
Electrical connected load: ca. 630 kW
Chiller: 237 kW
Heating load: 135 kW
 
Construction period:
2004 until 2008
 
Production costs:
€ 1.000.000,00 (net)

       

Pipera Business Tower, Romania

       
Project:
New development of an office building and a commercial property Pipera Business Tower, Bucharest/Romania
 
Client:
S + B Plan & Bau GmbH
Löwengasse 47, A-1130 Wien
 
Scale:
Heating/Air conditioning/Ventilation/Sanitary/
Electrial engineering (Design & Accompanying Site Supervision)
 
▪ Heating and cooling of the office
  rooms with fan coils
▪ Heat generation with gas boiler
  systems
▪ Refrigeration with refrigerating
  machines on the roof
▪ Temperature control of the
  underground parking
▪ Central measurement and control
  technology
▪ Closed circuit television
▪ Access control
▪ Standby power supply system
▪ Fire alarm system, safety lighting
  system

Technical data:
Heat output:                        850 kW
Cooling capacity:                 850 kW
Electrical connected load: 1,200 kW
 
Construction period:
March 2008 until December 2009
 
Production costs:
€ 1,500,000.00
(net - only electrical engineering)

       
       
 
 

 

 